07.02.2019 Nurek hydropower rehabilitation project

The Republic of Tajikistan has received financing from the World Bank International Development Association and Asian Infrastructure Investment Bank toward the cost of the Nurek Hydromechanical Equipment rehabilitation project. It is intended that part of the proceeds of this loan will be applied to eligible payments under the contract for Package 3, Hydromechanical equipment.

16.05.2019 Nurek hydropower rehabilitation project

The Republic of Tajikistan has applied for financing from the World Bank International Development Association and Asian Infrastructure Investment Bank toward the cost of the Nurek hydropower rehabilitation project, and intends to apply part of the proceeds toward payments under the contract for Monitoring equipment and left bank geotechnical investigations.

01.06.2018 Nurek Hydropower Rehabilitation Phase 1 (deadline until 08.06.2018)

Open Stock Holding Company “Barqi Tojik” has received loan and grant from the International Development Association and Loan from Asian Infrastructure Investment Bank and intends to apply part of the proceeds to eligible payments under the contract with individual consultant, which shall provide the services as Environmental Consultant of PRG “Energy Loss Reduction”.

01.06.2018 Sugd Energy Loss Reduction Project

SUGD-Lot 3, Construction of new 100/10 kV substation “Temurmalik” and related connection from existing AC substation

21.05.2018 Nurek Hydropower Rehabilitation Phase 1 (deadline until 01.06.2018)

Open Stock Holding Company “Barqi Tojik” has received loan and grant from the International Development Association and Loan from Asian Infrastructure Investment Bank and intends to apply part of the proceeds to eligible payments under the contract with individual consultant, which shall provide the services as Environmental Consultant of PRG “Energy Loss Reduction”.

07.05.2018 Nurek Hydropower Rehabilitation Phase 1

Open Stock Holding Company “Barqi Tojik” has received loan and grant from the International Development Association and Loan from Asian Infrastructure Investment Bank and intends to apply part of the proceeds to eligible payments under the contract with individual consultant, which shall provide the services as Environmental Consultant of PRG “Energy Loss Reduction”.

20.12.2017 Environmental and Social Impact Assessment (Volume II)

According to the approved ToR and the project schedule for the CASA-1000 project, studies on bird migration were conducted during the birds migratory period in spring 2017 in the vicinity of the high-voltage transmission line (HVTL) in the Khatlon region of the Republic of Tajikistan.

20.12.2017 Environmental and Social Impact Assessment (Volume I)

1. Project objective. The initial proposed CASA-1000 project development objective is to facilitate the first electricity trade of 1,300 megawatts (MW) of existing summertime hydropower surplus between the two regions, involving the Kyrgyz Republic and Tajikistan in Central Asia and Afghanistan and Pakistan in South Asia. Project preparation was guided by the 4-country minister-level Inter-Governmental Council (IGC) with a Secretariat that was put in place in 2011 and through consultations with the 10-member Central Asian Regional Economic Cooperation (CAREC) program. The project is expected to consist of the construction and operation of transmission infrastructure in the four countries, associated technical assistance during implementation, and mechanisms for the sharing of benefits with communities along the transmission corridor and would contribute to alleviating power supply shortages in Pakistan and Afghanistan and would enhance revenues and economic prospects in the Kyrgyz Republic and Tajikistan.


11.12.2017 Request for expressions of interest for audit of the OSHC “Barqi Tajik” and PRG Energy Loss Reduction for the fiscal year ending December 31, 2017
The OSHC “Barqi Tajik” assigned for selection and recruitment of an audit firm, now invites eligible consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. 

28.11.2017 Construction of new 110/10 kV substation “Temurmalik” and related connection from existing AC substation

This Invitation for Tenders follows the General Procurement Notice No. 8419-GPN-41538 for this project which was published at in Procurement Opportunities on the EBRD website: 28 September 2016. 

23.10.2017 Qairokkum hydropower rehabilitation project - FIDIC engineer

OSHC "Barki Tojik" (the “Client”) has requested the EBR and Development to provide technical assistance for the rehabilitation of the hydro-mechanical and electro-mechanical equipment of the “Qairokkum HPP” to increase dam safety and resilience to climate change, and improve the quality and quantity of electricity supply.

08.09.2017 Initial Resettlement Action Plan for the CASA 1000 Project

Request for expression of interest (company selection) consulting services for: initial resettlement action plan for the CASA 1000 Project

24.08.2017 Nurek hydropower rehabilitation project

The Republic of Tajikistan has applied for financing from the World Bank International Development Association and Asian Infrastructure Investment Bank toward the cost of the Nurek hydropower rehabilitation project, intends to apply for financing for the Phase 2 of the Project and intends to apply part of the proceeds toward payments under the Contract for Power plant rehabilitation.

22.08.2017 Request for expression of interest consulting services (deadline until 28.08.2017)
For feedback consultations on the final report on environmental and social impact assessment of the rehabilitation of the Nurek hydropower plant

07.08.2017 Request for expression of interest consulting services (deadline until 21.08.2017)

For feedback consultations on the final report on environmental and social impact assessment of the rehabilitation of the Nurek hydropower plant

05.05.2017 Golovnaya 240 MW HPP Rehabilitation Project

Lot 2: Rehabilitation Works of Switchyards of Golovnaya Hydropower Plant

Results of International Competitive Bidding for Plant Design, Supply and Install

25.04.2017 Contract Awarded by QCBS

Contract Awarded by QCBS (Project Implementation Unit Consultancy Services for Temurmalik Substation)

18.04.2017 Request for expressions of interest consultant services –financial audit
The Republic of Tajikistan has received financing from the Islamic Development Bank toward the cost of the Reconstruction of Ravshan Electricity Substation project and intends to apply part of the proceeds for consultant services. The services include Audit of Project’s Financial Statement and preparation of its Report. Please refer to the General Procurement Notice for this project that appeared in Jumhuriat Newspaper under No. 75, dated 29 April 2014 and 20 May 2014.

25.01.2017 Nurek Hydropower Plant Rehabilitation Project-Final ESIA Report
Final ESIA Report (in English language)

25.01.2017 Nurek Hydropower Plant Rehabilitation Project
Final Minutes of Public Consultations on ESIA (in English language)