12.06.2025
REQUEST FOR EXPRESSION OF INTEREST (CONSULTING SERVICES – FIRMS SELECTION) FOR CONSULTANCY TO HOLD PUBLIC CONSULTATIONS, INFORMATION SHARING AND CONDUCT AN ASSESSMENT OF BENEFICIARY SATISFACTION WITH CITIZEN ENGAGEMENT MECHANISM IN THE FRAME OF NUREK HYDR
Republic of Tajikistan
Nurek Hydropower Rehabilitation Project
OJSC “Barqi Tojik”
Loan No. IDA 60240
Reference No.: TJ NHPP CS 06-2025
11.06.2025
Environmental Monitoring Report
TAJ: Reconnection to the Central Asian Power System Project. Semi-annual Environmental Monitoring Report for 01 July – 31 December 2024
06.05.2025
Social Monitoring Report
Tajikistan: Wholesale Metering and Transmission
Reinforcement Project
Package 4: «Installation of wholesale meters at 500 kV, 220 kV,
110 kV and 35 kV levels»
01.05.2025
Environmental Monitoring Report
Tajikistan: Wholesale Metering and
Transmission Reinforcement Project.
Package 4: «Installation of wholesale meters at 500 kV, 220 kV,
110 kV and 35 kV levels»
Prepared
19.03.2025
REQUEST FOR EXPRESSIONS OF INTEREST CONSULTING SERVICES FOR: LOCAL INDIVIDUAL CONSULTANT FOR ENGLISH LANGUAGE COURSES IN THE FRAME OF NUREK HYDROPOWER REHABILITATION PROJECT
Republic of Tajikistan
OJSC “Barqi Tojik” / Nurek Hydropower Rehabilitation Project Phase 1
Consulting Services / Contract reference: TJ NHPP CS 25-1
27.02.2025
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS SELECTION)
Country: Republic of Tajikistan
Name of the Project: "Central Asia-South Asia Electricity Transmission and Trade CASA-1000"
Loan No./Credit No./ Grant No.: IDA E2850-TJ
Assignment Title: Detailed Engineering Design for a new drainage system for a converter station and support during tender process.
Reference No. (as per Procurement Plan): TJ-ES PMU-473576-CS-CQS
26.02.2025
Social Monitoring Report
This Semi-annual social monitoring report is a document of the Borrower. The views expressed herein do not
necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference
to a particular territory or geographic area in this document, the Asian Development Bank does not intend to
make any judgments as to the legal or other status of any territory or area.
12.02.2025
Social Monitoring Report
Tajikistan: Reconnection to the Central Asian Power
System Project
20.12.2024
REQUEST FOR EXPRESSIONS OF INTEREST CONSULTING SERVICES FOR: ENGLISH LANGUAGE COURSES IN THE FRAME OF NUREK HYDROPOWER REHABILITATION PROJECT (UPDATED DEADLINE)
Republic of Tajikistan
OJSC “Barqi Tojik” / Nurek Hydropower Rehabilitation Project Phase 1
Consulting Services / Contract reference: TJ NHPP CS 25
05.12.2024
REQUEST FOR EXPRESSIONS OF INTEREST CONSULTING SERVICES FOR: ENGLISH LANGUAGE COURSES IN THE FRAME OF NUREK HYDROPOWER REHABILITATION PROJECT
Republic of Tajikistan
OJSC “Barqi Tojik” / Nurek Hydropower Rehabilitation Project Phase 1
Consulting Services / Contract reference: TJ NHPP CS 25
29.10.2024
Tajikistan: Golovnaya 240-Megawatt Hydropower Plant Rehabilitation Project
Prepared by the State Establishment «Project Management Unit for Electro-Energy Sector» (SE«PMUES») for the Executing Agency Open Joint Stock Company «Barqi Tojik» (BT) and the Asian Development Bank (ADB).
25.10.2024
Tajikistan: Reconnection to the Central Asian Power System Project
Package 1: Construction of Transmission Line 500 kV, upgrade of highvoltage
substation equipment, relay protection, telecommunications
and SCADA, and Fibre-Optic Cables installation.
Package 2: Upgrade of the Emergency Automation System.
21.10.2024
Contract Award Publication – Penstock inspection and repairs
Penstock inspection and repairs
12.08.2024
Tajikistan: Reconnection to the Central Asian Power System Project
Tajikistan: Reconnection to the Central Asian Power System Project
Package 1: Construction of Transmission Line 500 kV, upgrade of high-voltage substation equipment, relay protection, telecommuni-cations and SCADA, and Fibre-Optic Cables installation.
Package 2: Upgrade of the Emergency Automation System.
06.08.2024
TAJ: Reconnection to Central Asian Power System Project
1. The Project objective is to ensure the power exchange of Tajikistan with Uzbekistan and the reconnection of Tajikistan with the Central Asian Power System (CAPS). The Project pro-vides for the complete restoration and reconnection of the Tajik power system with Uzbek power system. This means the restoration of parallel operation of the Tajik energy system with the regional one, from which Tajikistan has been cut off in 2009. Within the Project framework in order to synchronize the electrical networks of Tajikistan and Uzbekistan, it is planned to install modern relays, circuit breakers, instrument transformers, auxiliary, and other equipment that will increase system reliability and will be installed at the connection points on 220 kV and 500 kV transmission lines.
03.07.2024
Tajikistan: Power Sector Development Program
Prepared by “Project Management Unit for Electro-Energy Sector” (SE “PMUES”) for the Republic of Tajikistan and Asian Development Bank (ADB).
This environmental monitoring report is a document of the recipient. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of ADB’s website.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the ADB does not intend to make any judgments as to the legal or other status of any territory or area.
29.05.2024
Request for bids (Until June 12, 2024)
Small works (One-Envelope Bidding Process)
Employer: OJSC Barqi Tojik
Project: Nurek hydropower rehabilitation project
Contract title: Penstock inspection and repairs
Country: Tajikistan
Credit No. 6024-TJ (Portion A), Credit No. 6025-TJ (Portion B), Grant No. D179-TJ
RFB No: TJ NHPP RFB P5
29.05.2024
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – INDIVIDUAL CONSULTANT SELECTION)
The OJSC «Barqi Tojik» has received financing from the World Bank toward the cost of the Grant No.: E2850-TAJ- CENTRAL ASIA-SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE “CASA-1000” PROJECT, and intends to apply part of the proceeds for hire of a Claims Specilaist.
The scope of work of the assignment (“the Service”) is included in the ToR and the duration of the contract is 6 months.
29.05.2024
Tajikistan: Golovnaya 240-Megawatt Hydropower Plant Rehabilitation Project
1. INTRODUCTION
1. This Semi-Annual Social Safeguards Monitoring Report for the Lot 1, Lot 2 and Lot 2A (Golovnaya Hydro Power Plant, Vose and Rudaki substations, and 10km overhead transmission line) covers the period from July to December 2023. The results of the Social Safeguard assessment prepared for the project concluded that, as per ADB Safeguard Policy Statement, the project is categorized as ‘B’. The Asian Development Bank (ADB) provided a grant to the Republic of Tajikistan to upgrade the Golovnaya Hydropower Plant (GHPP) and to increase the supply of renewable energy to national and regional power systems. Golovnaya HPP is situated 80 kilometers south of Dushanbe. Its installed generation capacity is 240 MW, which makes it the fourth largest hydropower plant in Tajikistan. The objective of monitoring report is to investigate on the status of any land acquisition and resettlement activities periodically as well as reporting of grievance, including the implementation of livelihood restoration programs, to ensure that the activities are implemented as planned and that mitigating measures designed to address adverse social impacts are adequate and effective. The project did not require any land acquisition or resettlement of people as GHPP and Vose substation are located at existing territory. The Rudaki substation is a new set up on open land required one hectare of land acquisition, included in the LARP, no displacement of people required. Likewise, for overhead line construction, required 11,952 m2 permanent, and temporary 52,386m2 land also included in the LARP. However, the semi-annual social safeguard monitoring report is based on site visits by PIC specialists on 06 July, 13 September, and 01 December 2023, review of project documents and consultation with PMU staff, confirms that there was no grievance reported during the reporting period concerning social safeguard matters.
Further to record, during this period no change occurred to Project Organization Structure and social management team and Contractors’ staffing.
29.05.2024
Tajikistan: Wholesale Metering and Transmission Reinforcement Project
GLOSSARY
Dehkan - Private household garden plots with full ownership by private citizens.
Jamoat - Sub-district administrative unit
Project - A proposed capital undertaking, typically involving the planning, design and
construction of a large-scale plant, facility or structure.
SNiP - Construction Norms and Rules (Tajikistan)