Projects

28.04.2021 Environmental and Social Impact Assessment (ESIA) of the subcomponent 1b - construction of a new 110/10 kV Isfara-1 substation with the associated construction of a 10-0.4 kV distribution network for power supply to the projected settlement

CSP Project Development Objective. The Project Development Objective is to increase quality of and access to energy, social and economic infrastructure services, and contribute to the strengthening of local governance capacity in communities in the project area. 

16.04.2021 Construction 500 KV transmission line South, Central and North parts of Tajikistan

Resettlement Action Plan. Section: 500 HVAC Transmission Line Route (T/L South segment). (Draft)

17.06.2020 Rehabilitation of Golovnaya 110 kV facility and construction of new 110 kV Rudaki substation in Vose district
The project includes the following components: (i) fully rehabilitate 110/35/10kV Vose substation (replace all switchgear; replace and increase the capacity of transformers; built additional 110kV bay and connect substation to SCADA); (ii) construct a new 110/10 kV Rudaki substation with one 110kV and eight 10 kV bays; and (iii) construct a new 10 km 110 kV transmission line connecting Vose substation and the new Rudaki substation. 

30.03.2020 Environmental and Social Impact Assessment. South segment

Environmental and Social Impact Assessment. South segment

05.05.2017 Golovnaya 240 MW HPP Rehabilitation Project

Lot 2: Rehabilitation Works of Switchyards of Golovnaya Hydropower Plant

Results of International Competitive Bidding for Plant Design, Supply and Install

31.10.2016 Wholesale Metering and Transmission Reinforcement Project

ADB Grant 0417-TAJ: Wholesale Metering and Transmission Reinforcement Project

Lot 1: “Replacement of electricity meters, replacement of several current transformers, replacement of several voltage transformers, Introduction of an advanced metering infrastructure and introduction of a settlement system”

Procurement Method: ADB Single-Stage, Two Envelope Bidding Procedure

31.10.2016 Rehabilitation Works for Generation Units of Golovnaya HPP

ADB Grant 0376-TAJ: Golovnaya 240 MW HPP Rehabilitation Project

Lot 1: Rehabilitation Works for Generation Units of Golovnaya HPP

Results of International Competitive Bidding for Plant Design, Supply and Install

Procurement Method: ADB Two Stage Bidding Process

Invitation
Invitation
for expressions of interest for the provision of
Project Number 47017-003: Wholesale Metering and Transmission Reinforcement Project