Размер шрифта: A A A
Цвет сайта: A A A A

Sharshara HPP

Sharshara HPP

Included in the structural unit of "Cascade Vakhsh HPP".

Sharshara HPP is in operation since 1959.

Installed capability 30 MW

Director - Kholnazarov Nurmahmad Dustovich

Tel .: (+ 992-32-50) 295-350; 6-21-20; 99-333-151


Year:  1958
Aggregates:  2х10800 kW / 1х8350 kW
Total installed capacity:  30 MW

Back to the list