12.08.2024
Tajikistan: Reconnection to the Central Asian Power System Project
Tajikistan: Reconnection to the Central Asian Power System Project
Package 1: Construction of Transmission Line 500 kV, upgrade of high-voltage substation equipment, relay protection, telecommuni-cations and SCADA, and Fibre-Optic Cables installation.
Package 2: Upgrade of the Emergency Automation System.
06.08.2024
TAJ: Reconnection to Central Asian Power System Project
1. The Project objective is to ensure the power exchange of Tajikistan with Uzbekistan and the reconnection of Tajikistan with the Central Asian Power System (CAPS). The Project pro-vides for the complete restoration and reconnection of the Tajik power system with Uzbek power system. This means the restoration of parallel operation of the Tajik energy system with the regional one, from which Tajikistan has been cut off in 2009. Within the Project framework in order to synchronize the electrical networks of Tajikistan and Uzbekistan, it is planned to install modern relays, circuit breakers, instrument transformers, auxiliary, and other equipment that will increase system reliability and will be installed at the connection points on 220 kV and 500 kV transmission lines.
03.07.2024
Tajikistan: Power Sector Development Program
Prepared by “Project Management Unit for Electro-Energy Sector” (SE “PMUES”) for the Republic of Tajikistan and Asian Development Bank (ADB).
This environmental monitoring report is a document of the recipient. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of ADB’s website.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the ADB does not intend to make any judgments as to the legal or other status of any territory or area.
29.05.2024
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – INDIVIDUAL CONSULTANT SELECTION)
The OJSC «Barqi Tojik» has received financing from the World Bank toward the cost of the Grant No.: E2850-TAJ- CENTRAL ASIA-SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE “CASA-1000” PROJECT, and intends to apply part of the proceeds for hire of a Claims Specilaist.
The scope of work of the assignment (“the Service”) is included in the ToR and the duration of the contract is 6 months.
29.05.2024
Tajikistan: Golovnaya 240-Megawatt Hydropower Plant Rehabilitation Project
1. INTRODUCTION
1. This Semi-Annual Social Safeguards Monitoring Report for the Lot 1, Lot 2 and Lot 2A (Golovnaya Hydro Power Plant, Vose and Rudaki substations, and 10km overhead transmission line) covers the period from July to December 2023. The results of the Social Safeguard assessment prepared for the project concluded that, as per ADB Safeguard Policy Statement, the project is categorized as ‘B’. The Asian Development Bank (ADB) provided a grant to the Republic of Tajikistan to upgrade the Golovnaya Hydropower Plant (GHPP) and to increase the supply of renewable energy to national and regional power systems. Golovnaya HPP is situated 80 kilometers south of Dushanbe. Its installed generation capacity is 240 MW, which makes it the fourth largest hydropower plant in Tajikistan. The objective of monitoring report is to investigate on the status of any land acquisition and resettlement activities periodically as well as reporting of grievance, including the implementation of livelihood restoration programs, to ensure that the activities are implemented as planned and that mitigating measures designed to address adverse social impacts are adequate and effective. The project did not require any land acquisition or resettlement of people as GHPP and Vose substation are located at existing territory. The Rudaki substation is a new set up on open land required one hectare of land acquisition, included in the LARP, no displacement of people required. Likewise, for overhead line construction, required 11,952 m2 permanent, and temporary 52,386m2 land also included in the LARP. However, the semi-annual social safeguard monitoring report is based on site visits by PIC specialists on 06 July, 13 September, and 01 December 2023, review of project documents and consultation with PMU staff, confirms that there was no grievance reported during the reporting period concerning social safeguard matters.
Further to record, during this period no change occurred to Project Organization Structure and social management team and Contractors’ staffing.
29.05.2024
Tajikistan: Wholesale Metering and Transmission Reinforcement Project
GLOSSARY
Dehkan - Private household garden plots with full ownership by private citizens.
Jamoat - Sub-district administrative unit
Project - A proposed capital undertaking, typically involving the planning, design and
construction of a large-scale plant, facility or structure.
SNiP - Construction Norms and Rules (Tajikistan)
08.05.2024
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICE – INDIVIDUAL CONSULTANT SELECTION)
TAJIKISTAN
CENTRAL ASIA-SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE “CASA-1000” PROJECT
Grant No.: E2850-TAJ
Assignment Title: State Establishment «Project Management Unit for Electro-Energy Sector»
CENTRAL ASIA-SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE “CASA-1000” PROJECT
02.05.2024
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICE – INDIVIDUAL CONSULTANT SELECTION)
TAJIKISTAN
CENTRAL ASIA-SOUTH ASIA ELECTRICITY TRANSMISSION AND TRADE “CASA-1000” PROJECT
Grant No.: E2850-TAJ
18.04.2024
Tajikistan: Reconnection to the Central Asian Power System Project
Package 1: Construction of Transmission Line 500 kV, upgrade of high-voltage substation equipment, relay protection, telecommuni-cations and SCADA, and Fibre-Optic Cables installation.
Package 2: Upgrade of the Emergency Automation System.
01.04.2024
Tajikistan: Wholesale Metering and Transmission Reinforcement Project
Lot 1: Replacement of electricity meters, replacement of several current transformers, replacement of several voltage transformers, introduction of an advanced metering infrastructure and introduction of a settlement system
Lot 2: Rehabilitation of Substation Rudaki and Extension of Substation Ayni 220 kV and Construction of 220 kV OHL between SS Ayni 220kV and SS Rudaki
Package 4: Installation of wholesale meters at 500 kV, 220 kV, 110 kV, and 35 kV levels
01.04.2024
Tajikistan: Reconnection to the Central Asian Power System Project
Package 1: Construction of Transmission Line 500 kV, upgrade of high-voltage substation equipment, relay protection, telecommu-nications and SCADA, and Fibre-Optic Cables installation.
Package 2: Upgrade of the Emergency Automation System.
01.04.2024
Tajikistan: Golovnaya 240-Megawatt Hydropower Plant Rehabilitation Project
Prepared by the State Establishment «Project Management Unit for Electro-Energy Sector» (SE «PMUES») for the Executing Agency Open Joint Stock Company «Barqi Tojik» (BT) and the Asian Development Bank (ADB).
10.11.2023
Tajikistan: Wholesale Metering and Transmission Reinforcement Project Prepared
Prepared by Implementing Agency: State Establishment "Project Management Unit for Electro-Energy Sector" (SE "PMUES") for the Executing Agency Open Stock Holding Company "Barqi Tojik" (BT), and the Asian Development Bank.
31.10.2023
TAJ: Reconnection to Central Asian Power System Project
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
28.07.2023
Semi-Annual Social Safeguards Monitoring Report
This Semi-annual social monitoring report is a document of the Borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
19.07.2023
TAJ: Power Sector Development Program
Prepared by Implementing Agency State Establishment “Project Management Unit for Electro-Energy Sector” (SE “PMUES”) for the Executing Agency Ministry of Energy and Water Resources and the Asian Development Bank.
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
17.07.2023
TAJ: Power Sector Development Program
Prepared by Implementing Agency State Establishment “Project Management Unit for ElectroEnergy Sector” (SE “PMUES”) for the Executing Agency Ministry of Energy and Water Resources and the Asian Development Bank.
The environmental due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature.
17.07.2023
TAJ: Reconnection to Central Asian Power System Project
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
07.07.2023
Environmen tal and Social Management Plan
The safety, well-being and health of all our employees is the main task of our Company. JSC “Tojikgidroelectromontaj” (hereinafter TGEM) has many years of experience in the construction of energy facilities in the Republic of Tajikistan employees undergo annual medical examinations, organize safety training for them, and are provided with a special work uniform and personal and collective safety equipment. Allowed to work employees who have passed safety training and passed exams to know the rules of safety at work.
Within the framework of this Health and Safety Plan, questions will be examined in detail on compliance with current rules and safety standards during the work on this Project, measures will be proposed to reduce risks and hazards at work
23.06.2023
Tajikistan: Wholesale Metering and Transmission Reinforcement Project
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.