Projects
Qairokkum Hydropower Rehabilitation Project | |
Country |
Tajikistan |
Business sector |
Power and Energy |
Project ID |
41553 - 47253 |
Funding source |
EBRD loan proceeds and PPCR loan and grant |
Type of contract |
Project goods, works and services |
Type of notice |
Invitation for Prequalification |
Issue date |
27 October 2016 |
Closing date |
20 December 2016 at 14:00 (local time) |
Qairokkum Hydropower Rehabilitation Project
Invitation for Prequalification
This Invitation for Prequalification follows the General Procurement Notice for this project which was published on the EBRD website, Project Procurement Notices (http://www.ebrd.com/pages/workingwithus/procurement/project.shtml) on 24 July 2015.
Barqi Tojik, hereinafter referred to as “the Client” or “BT”, intends using part of the proceeds of a loan from the European Bank for Reconstruction and Development (EBRD) and European Investment Bank (EIB) as well as potential funding from the Green Climate Fund (“GCF”) towards the cost of Qairokkum Hydropower Rehabilitation Project.
The Client intends prequalifying firms and consortia to tender for the following contract hereinafter referred to as “the Contract”, to be funded from part of the proceeds of the loan.
Supply and Installation of Hydraulic Steel Components, Turbines, Electromechanical Equipment and Power House and Concrete Dam Rehabilitation
Project Background
Qairokkum hydropower plant is located on the Syr-Darya River in northern Tajikistan was commissioned in 1959. The existing six Kaplan turbines with a total capacity of 126 MW generate on average 700 GWh per year.
The reservoir is used for seasonal regulation of the water in Syr-Darya for irrigation needs as well as for generation of electricity. The Qairokkum plant is the only electricity generating facility in northern Tajikistan, but its current capacity is insufficient to meet electricity needs in the area, especially during winter. Most of the electric and mechanical equipment of Qairokkum plant has reached the end of its lifetime and a major rehabilitation, including the replacement of all turbines is envisaged.
Although the plant has been in operation for almost 60 years, it is very well maintained and is still generating electricity. However, the likelihood of major failure is increasing, thus a complete rehabilitation is required.
The Supply and Installation Contract comprises of the following main components:
· Refurbishment of hydro-mechanical and electro-mechanical equipment and associated installations;
- Upgrading and replacement of Hydraulic Steel Structures
- Rehabilitation and replacement of all six (6) units of Kaplan turbines which intend to increase the total rated capacity of the plant from 126 MW to 174 MW;
- Execution design of new equipment and interface parts;
- Dismantling of old equipment;
- Crack detection and repair on equipment to be overhauled;
- Erection and commissioning of new equipment;
- Training of operation and maintenance staff in Russian language;
- Documentation in English and Russian languages.
· Upgrading works for increasing the safety level of the power plant, the dam and the reservoir to include;
- Leakage control measures;
- Construction of a cut-off wall along the entire length of the dam of about 1,250 m;
- Improving connection measures to increase tightness between the dam and existing power house structure;
- Associated civil works for the plant rehabilitation.
Further details are included in the prequalification documents; refer to Part B Information on the Contract.
The Contract will be based on FIDIC’s Conditions of Contract for Plant and Design-Build for Electrical and Mechanical Plant, and for Building and Engineering works, Designed by the Contractor (FIDIC Yellow Book).
It is envisaged that the Contract will be awarded during 3rd quarter 2017 with a scheduled time for completion of about 90 months.
Prequalification and tendering for contracts to be financed with the proceeds of a loan from the Bank is open to firms and joint ventures of firms from any country.
Prequalification documents may be obtained from the office at the address below upon payment of a non-refundable fee of EUR 200 or equivalent in a convertible currency, including a Russian translation of the document.
Bank Details:
Bank Details for Tajik Somoni |
|
Bank Name: |
State Savings Bank of Tajikistan |
Bank address: |
24, Lohuti Str. Dushanbe, Tajikistan |
MFO: |
350101626 |
Corresponding account: |
20402972316264 |
Tax Identification Number: |
040000011 |
Beneficiary Account: |
20202972700469101000 |
Beneficiary: |
OSHC “Barqi Tojik”. |
Bank Details for USD | |
Intermediary bank: |
DEUTSCHE BANK TRUST COMPANY AMERICAS |
Bank address: |
NEW YORK, NY US |
SWIFT: |
BKTRUS33 |
Bank correspondent: |
NOVIKOMBANK |
Bank address: |
MOSCOW, RU |
SWIFT: |
CNOVRUMM |
Account: |
04437699 |
Beneficiary bank: |
STATE SAVINGS BANK OF TAJIKISTAN |
Bank address: |
“AMONATBONK” DUSHANBE, TAJIKISTAN |
Bank account: |
30111840700000000019 |
SWIFT: |
ASSETJ22 |
Beneficiary: |
OSHC “Barqi Tojik”. |
Beneficiary account: |
20206840400428101000. |
Bank Details for EUR | |
Bank correspondent: |
COMMERZBANK AG |
Bank address: |
FRANKFURT AM MAIN, GERMANY |
SWIFT: |
COBADEFF |
Account: |
400886559400 |
Beneficiary bank: |
STATE SAVINGS BANK OF TAJIKISTAN |
Bank address: |
“AMONATBONK” DUSHANBE, TAJIKISTAN |
SWIFT: |
ASSETJ22 |
Bank address: |
24, Lohuti Str. Dushanbe, Tajikistan |
Beneficiary: |
OSHC “Barqi Tojik”. |
Beneficiary account: |
20206978200176101000 |
Upon receipt of appropriate evidence of payment of the non-refundable fee, the documents will promptly be dispatched by courier; however, no liability can be accepted for their loss or late delivery.
The prequalification documents must be duly completed and delivered to the address below, on or before 14:00 (Dushanbe local time) on 20 December 2016.
Any documents which are received late may be rejected and returned unopened.
Venue: State Committee on Investment and State Property Management of Republic of Tajikistan.
Address: 27, Shotemur Str., 734001, Dushanbe, Republic of Tajikistan (Tender Box No.2)”
Please note that the delivery requirements are four (4) hard copies (one original and three copies) plus one (1) electronic copy on CD-ROM in English and Russian each of the prequalification application.
Interested firms may obtain further information from, the following office:
Attn.: Mr. Habibov Ubaidullo
Head of Project Realization Group of
Energy Loss Reduction Project OSHC Barqi Tojik
Address: 64, Ismoili Somoni Street, Room 302
Dushanbe, Tajikistan
Fax: (+992-37) 235-87-64
E-mail: elrpbt@gmail.com