Размер шрифта: A A A
Цвет сайта: A A A A

Projects

17.04.2020

Contract Award Publication

Contract No. TJ NHPP RFB P4 - Switchyard

Project Name / Country:

Nurek Hydropower Plant Rehabilitation Project. Phase 1, Republic of Tajikistan

Contract Duration:

28 months

Description:

Execution design for replacement of six autotransformers, refurbishment and partial replacement of various high voltage equipment and ancillary systems.

Decontamination of structures with respect to rehabilitation of equipment.

Supply of new equipment and spare parts including shipping to site.

Dismantling of existing equipment, erection and commissioning of new equipment, one group of three single-phase autotransformers at a time, with minimized impact on power plant operation and power production.

Associated civil works.

Supply of new equipment and spare parts including shipping to site.

Contract Reference Name / Number:

Rehabilitation of Nurek Hydropower Plant

TJ NHPP RFB P4 - Switchyard

Awarded Bidder:

Consortium of the Joint Stock Company Tojikgidroelectromontaj and Co Ltd Togliatti Transformator

Principal place of business

734060 N. Huvaydullaev street, 377/1, Dushanbe, Tajikistan

Signed Contract price:

USD 19,428,120 (excluding VAT).

Contract signing date:

April 14, 2020

Bidders:

1. Harbin Electric International Co Ltd, (China)

2. TBEA Co Ltd (China)

3. Larsen and Tourbo Limited (India)

4. Cobra Instalaciones y Servicios SA (Spain)

5. LLC Inter Rao - Engineering (Russia)

6. Consortium of the JSC Tojikgidroelectromontaj and Co Ltd Togliatti Transformator (Tajikistan - Russia)

7. Farab (Iran)

Read-out Bid prices:

1. Harbin Electric International Co Ltd

2. TBEA Co Ltd

3. Larsen and Tourbo Limited

4. Cobra Instalaciones y Servicios SA

5. LLC Inter Rao - Engineering

6. Consortium of the JSC Tojikgidroelectromontaj and Co Ltd Togliatti Transformator

7. Farab

1. USD 38’421’014

2. USD 15’560’000

3. USD 17’701’727 + TJS 60’312’191

4. USD 27’573’237 + TJS 6’925’791

5. USD 38’797’259

6. USD 19’428’120

7. USD 14’344’000 + TJS 40’406’000

Total evaluated bid prices:

1. Larsen and Tourbo Limited

2. Cobra Instalaciones y Servicios SA

3. LLC Inter Rao - Engineering

4. Consortium of the JSC Tojikgidroelectromontaj and Co Ltd Togliatti Transformator

5. Farab (Iran)

1. USD 22’670’610.35

2. USD 28’288’350.98

3. USD 38’797’266.00

4. USD 19’428’120.00

5. USD 19’798’835.20

Bidders rejected:

o Harbin Electric International Co Ltd

o TBEA Co Ltd

Non-responsive

Non-responsive


Back to the list