Размер шрифта: A A A
Цвет сайта: A A A A

Projects

15.07.2021 Request for bids Rural Electrification Project, Component 2: Provision of Electricity Service to Target Settlements in Khatlon Region

Plant, Design, Supply, and Installation of Works for the Construction of the 10 kV Medium Voltage Power Lines and Associated LV Networks for Target Settlements in Khatlon Region

05.07.2021 Invitation for tenders two stage

Supply and Installation of Billing and Metering Infrastructure and Rehabilitation of Distribution Lines 0.4 KV Single Circuit ABC in the Cities of Kulob and Bokhtar Including Surroundings

30.06.2021 Resettlement Action Plan Section: 500 HVAC Transmission Line Route (T/L Central segment)

Construction 500 KV Transmission Line South, Central and North Parts of Tajikistan

11.05.2021 Grant 0778-TAJ: Power Sector Development Program (extension of the term until 15.06.2021)
G2 - Procurement of Advanced Metering infrastructure, Low-Voltage and Medium-Voltage Enhancement for Dushanbe, Buston, Dangara, Panjakent, Konibodom, Isfara and Istaravshan, plus Boundary Meters

06.05.2021 Notification of Contract Awarded by QCBS
Project contract award: Rehabilitation of Nurek hydroelectric power plant Phase I 

06.05.2021 Consulting services for: Feasibility study for new Tajikistan-Afghanistan high voltage interconnection line

The World Bank has agreed to provide financing under the Nurek Hydropower Rehabilitation Project to Barqi Tojik to carry out the necessary techno-economic studies and assessments for new Tajikistan-Afghanistan high voltage interconnection line project. 

28.04.2021 Environmental and Social Impact Assessment (ESIA) of the subcomponent 1b - construction of a new 110/10 kV Isfara-1 substation with the associated construction of a 10-0.4 kV distribution network for power supply to the projected settlement

CSP Project Development Objective. The Project Development Objective is to increase quality of and access to energy, social and economic infrastructure services, and contribute to the strengthening of local governance capacity in communities in the project area. 

19.04.2021 ADB Grant 0622-TAJ: Reconnection to the Central Asian Power System Project
Contract Award Notice

19.04.2021 ADB Grant 0622 : Contract Award Notice. Supply and installation of relay protection systems in various substations, and construction of two 500 kv interconnection points in Sugd substation.
0622-TAJ:  Reconnection to Central Asian Power System, Package 1

16.04.2021 Construction 500 KV transmission line South, Central and North parts of Tajikistan

Resettlement Action Plan. Section: 500 HVAC Transmission Line Route (T/L South segment). (Draft)

30.03.2021 Specific Procurement Notice Request for Bids
CASA-1000 COMMUNITY SUPPORT PROJECT. Subcomponent 1A Supply and installation contract for village electricity in Sogd, Khatlon, RRS Regions & Vorukh and Chorkuh –Village electricity supply improvements in the corridor of impact

19.03.2021 Consulting services for: preparation of emergency preparedness plan for Vakhsh Cascade

At the request of the Government of Tajikistan (GoRT), the World Bank has agreed to finance preparation of an Emergency Preparedness Plan (EPP) for the Vakhsh Cascade in Tajikistan under the Nurek Hydropower Rehabilitation Project.

19.03.2021 Grant 0778-TAJ: Power Sector Development Program
G2 - Procurement of Advanced Metering infrastructure, Low-Voltage and Medium-Voltage Enhancement for Dushanbe, Buston, Dangara, Panjakent, Konibodom, Isfara and Istaravshan, plus Boundary Meters

04.03.2021 Construction 500 KV Transmission Line South, Central and North Parts of Tajikistan
Involuntary acquisition of lands could result in physical and economic displacement warranting the preparation of a site specific Resettlement Action Plan (RAP) to address such issues in a manner to ensure, at least, the same level of well-being of affected people with the project as without it.

01.02.2021 Notice of contract award BT/CSP/1BC

Notice of contract award Supply and Installation for construction of Isfara-1 110/10 kV SS & distribution networks improvements, line & substation project, Subcomponent 1B

05.01.2021 REQUEST FOR PROPOSAL
In the frame of this contract it is planned to dismantle the generator

22.12.2020 Contract Award. Installation of wholesale meters at 500kV, 220kV, 110kV, and 35kV levels
The Republic of Tajikistan has received financing from the Asian Development Bank (ADB) toward the cost of the Wholesale Metering and Transmission Reinforcement Project. Part of this financing will be used for payments under the contract named above. Bidding was open to Bidders from eligible source countries of ADB.

22.12.2020 Contract Award Notice. Power Sector Development Program
Power Sector Development Program. Project Implementation Consultant. ADB Quality and Cost Based Selection (QCBS) 

23.11.2020 Rural Electrification Project
Contract award notice. Preparation of Technical Specifications, with detailed justifications, for the connection of target settlements to Barqi Tojik´s distribution network and Bidding Documents.

14.10.2020 CASA.1000.ESIA Vol 2 North_segment

ANNEXES for the Environmental and Social Impact Assessment. CASA-1000 TRANSMISSION LINE – NORTH SEGMENT Volume II


Новости 41 - 60 of 169
First | << | 1 2 3 4 5 | >> | Last