10.07.2020 Contract Award Publication Contract No. TJ NHPP RFB P2.1 - Dam Safety Investigations and Monitoring
Rehabilitation of Nurek Hydropower Plant Project. TJ NHPP RFB P2.1 - Dam Safety Investigations and Monitoring

10.07.2020 Contract Award Publication Contract No. TJ NHPP RFB P3 - Hydromechanical Equipment

Rehabilitation of Nurek Hydropower Plant Project TJ NHPP RFB P3 - Hydromechanical Equipment


06.07.2020 ESIA - Construction of transmission line:NORTH SEGMENT

Environmental and Social Impact Assessment (ESIA). Construction of transmission line:NORTH SEGMENT

(review draft)

06.07.2020 ESIA - Construction of transmission line: CENTRAL SEGMENT

Environmental and Social Impact Assessment (ESIA). Construction of transmission line: CENTRAL SEGMENT

(review draft)

17.06.2020 Rehabilitation of Golovnaya 110 kV facility and construction of new 110 kV Rudaki substation in Vose district
The project includes the following components: (i) fully rehabilitate 110/35/10kV Vose substation (replace all switchgear; replace and increase the capacity of transformers; built additional 110kV bay and connect substation to SCADA); (ii) construct a new 110/10 kV Rudaki substation with one 110kV and eight 10 kV bays; and (iii) construct a new 10 km 110 kV transmission line connecting Vose substation and the new Rudaki substation. 

25.05.2020 STAKEHOLDER ENGAGEMENT PLAN (Final)
STAKEHOLDER ENGAGEMENT PLAN
Nurek Hydropower Rehabilitation Project Phase 2
Republic of Tajikistan

25.05.2020 Environmental & Social Impact Assessment and Environmental & Social Management Plan
Environmental & Social Impact Assessment and Environmental & Social Management Plan
Nurek Hydropower Rehabilitation Project Phase 2
Republic of Tajikistan

25.05.2020 Environmental and Social Impact Assessment (Final)
Environmental and Social. Impact Assessment. Nurek Hydropower Rehabilitation Project Phase 2
Republic of Tajikistan

25.05.2020 Environmental and Social Management Plan (Final)
Environmental and Social Management Plan. Nurek Bridge Rehabilitation. Nurek Hydropower Rehabilitation Project

13.05.2020 CONSTRUCTION OF TRANSMISSION LINE: SOUTHERN SEGMENT
Environmental and Social Impact Assessment

13.05.2020 CONSTRUCTION OF TRANSMISSION LINE: SOUTHERN SEGMENT
Environmental and Social Impact Assessment

28.04.2020 Draft Updated Nurek ESIA
Environmental and Social Impact Assessment >>>>>>

17.04.2020 Contract Award Publication Contract No. TJ NHPP RFB P4 - Switchyard

Execution design for replacement of six autotransformers, refurbishment and partial replacement of various high voltage equipment and ancillary systems.

Decontamination of structures with respect to rehabilitation of equipment.

Supply of new equipment and spare parts including shipping to site.

Dismantling of existing equipment, erection and commissioning of new equipment, one group of three single-phase autotransformers at a time, with minimized impact on power plant operation and power production.

Associated civil works.

Supply of new equipment and spare parts including shipping to site.

30.03.2020 Environmental and Social Impact Assessment. South segment

Environmental and Social Impact Assessment. South segment

18.03.2020 Contract Awarded
Project Name: Central Asia South Asia Electricity Transmission and Trade CASA-1000 Project

29.01.2020 Connection of target settlements in Khatlon region of Tajikistan to Barqi Tojik’s electricity distribution network

 Barqi Tojik (BT) has engaged the Energy Sector Project Management Unit (ESPMU) – a state establishment - to carry out the project activities, including procurement, FM, technical supervision, and monitoring and evaluation (M&E). ESPMU/BT will need support of an experienced consultant to prepare for and supervise various aspects of the proposed grid-connection works. 

29.01.2020 Rural Electrification Project

Provision of electricity service to target settlements in Khatlon region

Grant No.: P170132

Assignment Title: PMC 

24.12.2019 Independent Environmental Monitoring Consultant (IEMC) for OSHC “Barqi Tojik”
The Republic of Tajikistan has received financing from the World Bank toward the cost of the TFOA4615-TAJ, and intends to apply part of the proceeds for consulting services.

21.11.2019 Power Utility Financial Recovery Program-for-Results
Barqi Tojik is fully owned by the Government. It owns and operates most of the electricity generating plants and is also responsible for electricity transmission, dispatch, and distribution services to around 8 million people in all regions of the country except for Gorno-Badakhshan Autonomous Oblast (GBAO) region of Tajikistan.

07.10.2019 Project: Reconnection to the Central Asian Power System Project
Contract Award Notice